Infrastructure

 

I
Area of land allotted (in acres)
Whether land transferred in the Name of Samiti
Vidyalaya shifted to permanent buildings on
30 Acres
Yes, Permanent
II
Status of Boundary Wall
A Brick Wall
B  Barbed wire fencing
50% Brick Wall
50% Barbedwire
III
Permanent buildings constructed
yes
IV
School building
Completed
V
Dormitories
Boys & Girls 10 Nos. with Warden Residence_12 Nos.
VI
Kitchen/ dinning Hall
No. of shifts required for all students to take food
Single
VII
Principal Residence
01 No.
VIII
Staff Quarters
Type III = 30 Nos
Type II =____-_____Nos
Type I  = 12 Nos
SP Sheds converted into Staff Qrs. ______Nos
IX
M.P. Hall
Not available
X
Workshop
 Not Available
XI
Type of O.H Tank
Its capacity
Present Status
Shaft type
1,00,000 litres
Working satisfactory
XII
U.G. Tank
Its capacity
Present Status
 
___N/A ____litres
Working satisfactory
XIII
D.G. Set
Available
____________make
____15 KV
Working
Year of procurement
XIV
Sewage Pump
NO
XV
Water Pump
NO
XVI
Electrification
Electric connection
Sub station building Street lighting
 
Numbers of hrs. during day when power supply is available on an average
 
Urban Feeder
Complete
75 Nos. of Poles (Approximetly)
 
16 hrs
XVII
Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court
 
Available
___02_____ Nos. Available
____03____ Nos. Available
XVIII
Water supply
Tube well
Hand Pump
Connection from PHED
Potable___06_Nos. working
Potable___ Nos. working
______ hours supply in a day
Note: Deflorination plant arranged
XIX
Rajiv Gandhi Smriti Van
Available
XX
Fire fighting arrangement
Working
XXI
Last date of cleaning of
A Septic Tank
B Water Tanks
 
28.05.2007
30.05.2008
XXII
Whether area around transformer is fenced
Yes
XXIII
Whether open wells, if any, are covered from top
-NA
XXIV
Works taken up under M&R fund during current year and last year
 
 
Year
Name of work (M&R)
Expenditure (Rs. In Lacs)
Cumulative expenditure during the year
 
2007-08
Replacing  of the broken window glasses
Repairing Woodden & Glass cupboards in Library, Labs, Principal & V.P.Chamber,
0.30
0.78
 
 
2008-09
1.Paintin of Staff Quarters
2. Purchase of submersible pump
    7.5 HP
0.75
 
0.23